West Antioch Creek Silt Removal, PW 201-5A
Work to be Performed: The work shall generally consist of the removal of silt and construction of new low-flow channel in West Antioch Creek and all other work shown on the plans.
Bid Documents
(click to expand/collapse)
Name | Size | ||
PW 201-5A Bid Forms_20230516 | 8.6 MB | ||
PW 201-5A Specs_20230516 optimized | 60.8 MB |